ENGINE
COMPARTMENT INSULATION
Installation
of noise-dampening barrier
GUEST
BATTERY CHARGER INSTALL
Installation
of 15A, 2 bank charger
BOWSPRIT REFURBISHING (June)
Bowsprit removal, sanding, and rebedding
RAW WATER STRAINER INSTALL (Mar 18)
Groco raw water strainer
TEMPO FUEL GAUGE and SENDING UNIT (Mar 28)
INSTALL PERKO BATTERY SWITCH (Mar 18)
EPOXY EMERGENCY TILLER ACCESS (Mar 28)
REPLACE ENGINE COOLING HOSES
(Mar 18)
NONSKID (June)
Removal of existing nonskid and repainting
FUEL DELIVERY SYSTEM (Sept)
Re-plumbing old fuel filter setup to accomodate two Racor 500FG filters and fuel polishing circuit
TRANSOM REPAIR and LETTERING
Filled holes from stern-mounted radar pole, application of name and hailing port
STORAGE SOLUTION
Rip-stop nylon storage bags
BOWSPRIT REPAIR (June)
Add Spartan bow rollers, repair cracks
HULL REPAIRS (Mar)
Sand hull, barrier coat, paint with VC-17
MID-SHIP CLEATS INSTALLATION (June)
Installation of Spartan mid-ship cleats
|
ENGINE BLOWER SWITCH & LED
Install toggle switch and LED for engine blower
MAST SKIRT
Sewing project to make mast surround
SANITATION HOSE INSTALL
Intalled odor-proof sanitation hose
INTERIOR CUSHION REPLACEMENT
New foam and custom covers
ROUTINE MAINTENANCE
Winch, seacock service, topside wax, bottom paint,
oil change, winterization
MAST SURROUND-Interior
Fabrication of teak surround at mast partner
FRESH WATER PUMP REPLACEMENT
Installation of new Perkins fresh water pump
ENGINE HOUR METER INSTALL
CHAIN LOCKER MODIFICATION (June 2006) Removed bottom and installed drains
MAST-MOUNTED RADAR
Location, mounting, wiring
AUTOHELM 4000+ INSTALL
ELECTRICAL PANEL REWIRE
Bus bar install, rewire of AC/DC panels
RAISE BOOTSTRIPE
Raising bootstripe to compensate for new weight
SHURFLO BLASTER WASHDOWN PUMP
(June 2006)
HOLDING TANK REPLACEMENT(June 2006)
Ronco Plastics holding tank B126
STARTER SOLENOID (March 2006)
Replacing solenoid on Perkins 4.108 diesel engine
|